Peterborough Construction

Gary,

In one of their catalogs the cedar strip joinery was described as follows:

…our longitudinal strip canoes are put together w. a shiplap joint and the mating surfaces are first flushed w. varnish before the strips are brought together as a ………

Cheers
Dick
 
Back
Top